亚洲愉拍自拍视频一区,在线观看极品裸体淫片av,中文字幕一区二区三区人妻精品,精品日产一区2区三区,一区二区av日韩免费,能看的网站中文字幕不卡av,亚洲高清一区二区三区在线观看,91国产自拍视频在线,日本不卡一区二区高清中文,精品蜜桃av一区二区三区

How to properly install swing particles?
Rock particles machine installation instructions
  The rock particles machines for the entire packing, unpacking after moved to the appropriate use of local, pad level to use.
  Electrical circuit means is not subject to the restriction of the rotational direction, the line is clamped by the base below to switching, the cable card via the belt cover.
  1.1 before installing the first reference to the packing list check parts are complete and damage the rock particles.
  1.2 installation, refer to the installation diagram which rock particles machine supporting chassis must be mounted horizontally on the foundation, the foundation should have sufficient stiffness and strength to support the the vibrating screen dynamic load and static load.
  1.3 can take advantage of the screen box trunnion lifting screening machine, lifting the entire sieve can not be directly linked to the exciter.
  Should ensure that a class of non-moving parts of the screen box and hopper, chute kept to a minimum 75mm gap between 1.4 installed swing particles machine screen machine.
  1.5 swing the particle machine equipment installed, maintained around the screen surface level, otherwise, you can adjust the spring seat support pad thin sheet iron.
  1.6 springs must be in a vertical state, the spring fixation in the sieve box of the trunnion.
  1.7 the vibration sieve drive direction given is standing on the feed side, face the direction of the flow of material, observed the motor position, the left-hand side to the left to the driver, the right-hand side for the right to drive. The vibrating screen with symmetrical design, both sides pulley. Replace the motor position to change the direction of the left and right drive.
  1.8 to ensure that the tension of the V-belt has a sufficient amount of adjustment the two pulley end surface adjustment in a plane.
  The 1.9 swing particles machine before the trial must be by hand (or other) rotating exciter. Flexible rotation, the jamming before starting rock particles.
  No-load commissioning, should be less than 2 hours after the end of the installation and adjustment of 1.10 rock particles, smooth operation, no abnormal noise bearing maximum temperature does not exceed 75 ° C.
  Rock particles machine instructions
  1. Use: starting rock particles, the mixture was poured into a hopper, and by the the rotating drum swing, squeezing the material through a screen to form particles, such as crushed pieces, should be added gradually, not fill, in order to avoid pressure is too large the screen wearing. 2. Note: Hopper as powder stop high, must not spent shovel, avoid hand injury accident, application of bamboo shovel or parking.
  Rock particles machine maintenance instructions
  1. Periodically check the parts, once a month, check the worm gear, worm gear, bearing and active part of the flexible and wear, discovered defects should be repaired in time, shall not be reluctant to use.
  2. Rock particles machine should be placed on a clean dry indoor atmosphere acids and its parts shall not contain corrosive gases flowing places.
  3. The rock particles machine after use or lockout, wash or brush cleared bucket remaining powder will remove the rotating drum, and then properly installed and ready to work for the next.
  4. Disable a longer time, must be rock particles systemic wipe clean parts of the glossy coated with anti-rust oil with a cloth booth
Related News:
· Innovation, energy saving, environmental protectio  
· Vacuum dryer product performance characteristics a  
· Vacuum dryer used for inspection and debugging wor  
· Difficulties and reasons cannot start mixing machi  
· The correct operation method using vacuum dryer  
· Development advantages and characteristics of dome  
· The difference between the special vacuum dryer an  
· Detailed description of each component characteris  
· The dominant position in the whole vacuum dryer dr  
· Trough type mixer sometimes appear large area leak  
Related Products:
· PGL Spray Drying Granulator
· High speed mixer
· SET series double screw extrusion pelletizer
· VI forced mixer
· Mixing machine W series
· Powder machine ZSJ series vibrating screen
· FZ series of crushing granulator
· Chinese medicine grinder
· DWT series of drier for dehydrated vegetables
· Multi-layer belt dryer

Copyright 2013 Chang Zhou Zhizun Machinery Co.,Ltd All Rights Reserved.Design by Reach.
Tel:86.519-88906508 Fox:86.519-88902679 Add:Jiaoxi Changzhou Jiangsu Pro China P.C:213116

综合偷自拍亚洲乱中文字幕| 国产精品成人一区二区三区| 国产超碰人人模人人爽人人喊| 236宅宅理论片免费| 韩国女主播一区二区在线观看| 日韩人妻无码精品二专区| 国产最新一区二区三区| 国产一区二区亚洲一区| 中文字幕精品亚洲字幕| 少妇激情av一区二区三区| 免费人成在线观看网站| 国产揄拍国产精品| 免费观看又污又黄的网站| 免费一级a毛片在线播出| av网址不卡免费在线观看| 国产女主播一区二区三区在线观看 | 一区二区三区视频免费观看在线| 国产乱人伦偷精品视频还看的| 日韩精品在线视频一二三| 俺去啦最新地址| 被黑人猛躁10次高潮视频| 久久精品中文字幕一区| 男人深夜影院无码观看| 国产一级一厂片内射视频播放| 日本老熟妇五十路一区二区三区 | a级毛片免费完整视频| 亚洲成a人片在线观看无码| 四虎国产精品成人影院| 午夜精品人妻中字字幕| 黄色一区二区三区大全观看| 欧美性生交大片免费看app麻豆| 欧美成免费a级毛片| 无遮无挡爽爽免费视频| 无码免费午夜福利片在线| 蜜臀一区二区av天堂| 一区二区三区视频亚洲| 亚洲国产精品无码aaa片| 国内嫩模自拍偷拍视频| 中文字幕无码成人片| 久久久亚洲欧洲日产国码αv| 亚洲av片不卡无码久久|